MNS-2022-021

Pharmaceutical Plant — Badr City

Industrial · Cairo · SEP 2023

Pharmaceutical Plant — Badr City
REFERENCEMNS-2022-021 · AS-BUILT
REFERENCE · NOT AN MANSOOB PROJECT · Pharmaceutical Plant — Badr City · SEP 2023
Pharmaceutical Plant — Badr City
Project codeMNS-2022-021
ClientPharmaceutical manufacturer
ConsultantCleanroom specialist consultant
LocationCairo
Built area18,600 m²
FloorsG+2
Our scopeStructure, finishes, cleanrooms and utilities
StartFEB 2022
HandoverSEP 2023
Actual duration19 months
ValueUndisclosed
Structural systemRC frame with beam-and-slab roof, 12 m spans
Foundations0.80 m raft on calcareous ground

The challenge, and how it was solved

Grade C and D cleanrooms required floor flatness of 3 mm over 3 m and pre-set levels for 400 mechanical penetrations. The MEP model was built before casting and 312 clashes were resolved in the technical office, so penetrations were formed in the shuttering rather than cut after the pour.

Images

Pharmaceutical Plant — Badr City — 2
REFERENCEMNS-2022-021 · 02
REFERENCE · NOT AN MANSOOB PROJECT · SEP 2023
Pharmaceutical Plant — Badr City — 3
REFERENCEMNS-2022-021 · 03
REFERENCE · NOT AN MANSOOB PROJECT · SEP 2023
Pharmaceutical Plant — Badr City — 4
MNS-2022-021 · DURING
PHOTOGRAPH · During construction
Pharmaceutical Plant — Badr City — 5
MNS-2022-021 · 05
PHOTOGRAPH · SEP 2023

Milestones

  1. FEB 2022

    Mobilisation

  2. OCT 2022

    Structure complete

  3. MAY 2023

    Cleanrooms complete

  4. AUG 2023

    Commissioning

  5. SEP 2023

    Handover