
General contracting
Full execution from foundations to handover, on remeasured or lump-sum contracts.
- ACTIVE SITES
- 11
- PEAK POUR
- 1,800 m³/DAY
- DIRECT LABOUR
- 2,400

Contracting, engineering & development · since 2006
We build and we develop — and every project here is stated with its area, its duration and our scope.
142 projects delivered2.8M m² handed over6 governorates900 engineers & technicians
Images tagged REFERENCE are build-phase reference imagery, not MANSOOB projects. They are replaced with real project photography before launch.
Capabilities
A consultant evaluating a bid reads figures, not adjectives. These come from the plant and project records.

Full execution from foundations to handover, on remeasured or lump-sum contracts.

Single responsibility for design and execution, shortening the programme to one approval path.

Piling, rafts, RC frames, post-tensioning and retaining systems.

HVAC, fire, plumbing, electrical and ELV — self-performed, not subcontracted.

Architectural finishes, facades, specialist works and cleanrooms.

Programme, claims and cost management on projects executed by others.
Projects
Every card states the sector, the area, the duration and the handover year.
6 projects

Administrative · 41,200 m² · 32 months · NOV 2023

Residential · 68,400 m² · 41 months · JUN 2023

Industrial · 18,600 m² · 19 months · SEP 2023

Commercial · 52,800 m² · 33 months · FEB 2026
Under construction

Education · 14,300 m² · 14 months · AUG 2020

Healthcare · 22,100 m² · 39 months · DEC 2025
Under construction
Plant
The full equipment register is below. Almost no Egyptian contractor publishes one — and it is the strongest possible proof of execution capacity.



| Type | Model | Capacity | Qty | Acquired |
|---|---|---|---|---|
| Fixed batching plant | Elba EMM 60 | 60 m³/hr | 3 | 2018–2022 |
| Mobile batching plant | Elba EMB 30 | 30 m³/hr | 2 | 2021 |
| Tower crane | Potain MDT 219 | 10 t / 65 m jib | 8 | 2019–2023 |
| Tower crane | Liebherr 200 EC-H | 10 t / 60 m jib | 4 | 2017–2020 |
| Stationary concrete pump | Putzmeister BSA 1409 | 90 m³/hr | 6 | 2018–2023 |
| Truck-mounted pump | Schwing S 43 SX | 43 m reach | 4 | 2020–2022 |
| Excavator | Komatsu PC300 | 1.8 m³ bucket | 12 | 2018–2024 |
| Piling rig | Bauer BG 28 | Ø1.50 m × 45 m | 3 | 2019–2022 |
| Formwork system | PERI SKYDECK / TRIO | 48,000 m² | 1 | 2019–2024 |
| Precast yard | In-house | 420 m³/day | 1 | 2021 |
| Maintenance workshop | In-house | 2 sites | 2 | 2016 |
| Generator | Caterpillar C18 | 500 kVA | 14 | 2018–2023 |
Quality & Safety
A contractor who publishes an LTIFR is a contractor who measures one.

| ISO | Scope | Certificate no. | Valid to |
|---|---|---|---|
| ISO 9001:2015 | Quality management | redacted | 2027 |
| ISO 14001:2015 | Environmental management | redacted | 2027 |
| ISO 45001:2018 | Occupational health and safety | redacted | 2026 |
Certificate numbers are redacted on this site. Full scans are provided in the prequalification pack.
Technical Office
Model, clash detection, quantity take-off and as-built handover — the part that wins the consultant.




Process
Seven stages, each with its duration and what we hand over.
01
02
03
04
05
06
07